Field service routing on real roads.

Route planning decides which vehicle or person serves which jobs, in which order. Optimized means: time windows and skills are kept, travel times come from the real road network, and the plan is recalculated when a job is added or cancelled.

Rules in the model

What the plan keeps, without anyone checking by hand.

Time windowsAgreed arrival times, opening hours, fixed appointments and waiting time on site.
SkillsWho may do which job, equipment in the vehicle, familiar faces for customers.
VehiclesCapacity, refrigeration, range and charging for electric vehicles, start and end at the depot.
Working timeShifts, breaks, driving and rest times.
Road networkTravel times from the real road network, not as the crow flies.

From practice

One project, as it actually went.

Project example

Field service scheduling

Dime Software: software for installation and trade businesses

Task
Assign technicians with their skills, vehicles and material to customer appointments, instead of planning by hand with fixed rules.
Result
Detailed scheduling with break rules and route optimization, adaptable for small and mid-sized businesses.

Use case as PDF (2 pages)

Typical fields

  • Sales and on-site customer advice
  • Rail engineering and track work
  • Trades, electrical and plumbing
  • Winter road service and road maintenance
  • Home care and therapy
  • IT and telecom field service

Industries

Routing for service technicians in your industry.

HVAC, refrigeration and heatingMaintenance contracts with deadlines, breakdowns first, technicians with the required certification, spare parts in the van.
Utilities and grid operatorsMeter changes, house connections and fault repair across a large area, with on-call duty and fixed windows at the customer.
Machine installation and serviceCommissioning, maintenance and repairs at customer sites, often over several days, with the right skills for each machine.
Surveyors and technical inspectionsOn-site appointments for surveys and inspections, with deadlines, specialisms and dates agreed with everyone involved.
Installation, electrical and telecomWallboxes, routers, fibre and smart home at the customer, with time windows, skills and material in the van.

Use cases

Seeing is believing.

Every case plays in your browser: the plan in time-lapse, with KPIs and the comparison to the usual way of planning.

07:00

Field service routing

Eight technicians, 29 home installations, arrival windows and skills, planned on the real roads around Windhagen.

Routing and field service

15:00

Agriculture harvest before the rain

Two combines from 10:00, rain from 16:00, two grain carts to the silo. The goal is the most crop value harvested before the weather turns.

Routing and field service

01:00

Night bus ride pooling

Bookings from the last trains, the village pub and between villages. Three minibuses pool the rides home on real roads.

Routing and field service

06:15

Store delivery e-trucks from the DC

Ambient, chilled and frozen orders for 28 stores on diesel and electric trucks. Loading order, store access, range and charging planned together.

Routing and field serviceEnergy and charging

06:30

Home care tours and continuity of care

A home care service with 42 clients and 14 carers. One week of tours with morning and evening peaks, split shifts, six pool cars and few different carers per client.

Workforce and shiftsRouting and field service

Weeks

Pharma field sales visit cycle

Three sales reps, 80 practices and three product lines. Every specialty gets its target visits at the practices’ reception hours, with little driving.

Routing and field service

06:00

Winter road service snowfall overnight

Snow starts at 03:30. Three spreader trucks plough and salt 61 km of real roads around Windhagen, the main roads by 06:00.

Routing and field service

12:20

Bulky waste collection by appointment

80 households booked a pickup for today, in the morning or in the afternoon. Four trucks collect in the booked windows and unload at the recycling yard when they are full.

Routing and field service

07:10

Ready-mix concrete one day of pours

16 truck mixers bring 786 m³ from two plants to 12 construction sites. Every pour should run without a break, and the concrete must be placed within 90 minutes.

Routing and field serviceProjects and construction

07:30

Parcel delivery deliveries and pickups

Six vans, 314 deliveries and 64 pickups in one day. Every stop in its window and no van over capacity at any point of the tour.

Routing and field service

Weeks

Tanker inventory routing diesel and gasoline by sea

Four product tankers, two refineries and five tank farms around a fictional sea, three weeks with a cold spell and a storm. Which ship calls where, how much it loads or discharges and how fast it sails, so no tank farm runs dry.

Routing and field service

01:45

Industrial bakery night production

About 120 dough batches, seven kneaders, four make-up lines, eleven ovens and 15 tours that leave between 01:45 and 05:30. Dough cannot wait, so the order of the doughs decides the night.

Routing and field serviceProduction and maintenance

WeeksVision

Autonomous trucks with transfer hubs

A vision: autonomous e-trucks drive the motorway, people take over at secure hubs for the first and last mile. What has to be planned for it to work.

Routing and field serviceEnergy and charging

07:25

Parcel delivery districts with core and flex zones

Six drivers keep the streets they know, and on a day with uneven volume a neighbour takes over a few border cells. Two levels: districts from the history, then the routes of the day.

Routing and field service

Weeks

Power line inspection drones from vans

About 98 km of real 110 kV and medium-voltage lines, three crews with a van as mobile launch point, one week in March. Which stretch from which launch point on which day, in the weather windows.

Routing and field service

All use cases

Approach

From the first call to value in operation.

  1. Stage 1Clarify

    1. UnderstandGoals, terms, rules, data, bottlenecksEntry: Planning Snapshot, Assessment or Strategy
    2. AssessPotential, business case, feasibility, risks

    DecisionIs it worth it?

  2. Stage 2Build

    1. DesignPlanning model, rules, data, interfacesEntry: training or model review
    2. PilotReal scenarios, value proven before much is invested
    3. Roll outIntegration, training, go-live

    DecisionDoes the pilot deliver what it promised?

  3. Stage 3Run

    1. StabiliseAccompany the first real planning rounds, sharpen the rulesEntry: support after go-live
    2. ImproveWatch the KPIs, take in new requirements

    CycleWhen operations change, we adapt the rules and the plan.

Entry points and decisions in detail

Questions

Frequently asked questions

Do you use real travel times?

Yes. Routes and travel times come from a road network such as OpenStreetMap, not from straight lines.

Is route planning available as a ready-made service?

Yes. The Timefold SaaS models offer field service and delivery routing as a service. When your rules go further, we build a model of your own.

Can the plan change during the day?

Yes. New jobs, cancellations and delays are planned in without turning the whole day upside down.

What is the difference between field service routing and route planning?

Route planning finds the way from A to B. Field service routing also decides who does which jobs in which order, within time windows, skills and working hours. In field service, that is the actual planning task.

Which businesses benefit from optimized field service routing?

Once several technicians drive changing jobs every day with time windows or skills, planning usually costs more driving and coordination than needed. Whether a model of your own pays off is what we clarify in the first step, including the answer that a ready-made service is enough.

The first step

Where does your planning lose time, capacity or money?

In a free first call we work out which next step is really worth it.