Home / Use cases

Route planning

On-demand night bus: pooling rides home around Windhagen

Which bus picks up which booking, and in which order, so that everyone gets home at night with short waits and few empty kilometres?

Result in this example, compared with “booking order, one ride at a time”: shared rides 68 % instead of 0 %, average wait 2.2 min instead of 4.9 min, bus kilometres 159.4 km instead of 228.2 km.

Public transportOn-demand mobilityRural transport

Drag to rotate, scroll or pinch to zoom. The schedule below plays the plan; hover a bar for details.

The planning question

On a Saturday night, passengers book a ride home: from the central bus stop when the last trains arrive, from the village pub, to the last regular bus, or between villages. Three 8-seat minibuses serve 16 villages around Windhagen; travel times come from the real road network.

How we plan it

A pickup-and-delivery model: each booking is a pickup and a drop-off on the same bus, with seats, time windows and ride limits checked along the route.

What the plan shows

KPIOptimized planComparison: booking order, one ride at a time
bookings served53 / 53 +1340 / 53
average wait2.2 min −2.74.9 min
bus kilometres159.4 km −68.8228.2 km
shared rides68 % +680 %

Decisions

  • bus per booking
  • order of pickups and drop-offs on each bus
  • pickup and drop-off times

Constraints

  • pickup within 15 to 20 minutes of the booked time
  • maximum ride time (1.8 × the direct ride + 5 minutes)
  • 8 seats per bus
  • rides to the last bus arrive before it leaves
  • buses back at the stop by 03:30

Objective

serve every booking with short waits and detours, few bus kilometres, many shared rides

Questions

Is this like a taxi?

No. The model pools rides: passengers going in the same direction share the bus, so more people travel with fewer kilometres.

Can new bookings come in during the night?

Yes. Rides on board stay fixed, the open part of the night is re-planned when a booking arrives.

The first step

Where does your planning lose time, capacity or money?

In a free first call we work out which next step is really worth it.