Home / Use cases

Allocation planning

Slotting: where each article should live in a pallet warehouse

Which pick slot should each article get, so that pickers walk less and bend less?

Result in this example, compared with “today's slotting”: bending & reaching 77 min instead of 216 min, picks at ergonomic height 60 % instead of 25 %, metres per order 84 instead of 108.

WholesaleDIY & gardenFood distribution

Drag to rotate, scroll or pinch to zoom. The schedule below plays the plan; hover a bar for details.

The planning question

A wholesale pallet warehouse with 8 wide aisles: three pick levels at the bottom of the racks (the top one needs an order-picker lift), reserve pallets above, goods out at the dock doors. Today the articles are stored by article number.

How we plan it

The model assigns articles to slots against a day of 600 orders, invented for this example, and measures the effect on walking distance on exactly these orders. Almost every article changes slot, and the work of moving them is not in the figures.

What the plan shows

KPIOptimized planComparison: today's slotting
walking per day (km)50.5 −1464.5
metres per order84 −24108
picks at ergonomic height (%)60 +3525
bending & reaching (min)77 −139216

Decisions

  • pick slot per article

Constraints

  • slot size and weight limits
  • heavy goods on low levels
  • articles ordered together close to each other

Objective

short walks per order, fast movers near goods out, many picks in the ergonomic zone

Questions

How often should slotting be re-done?

Typically weekly or with seasonal changes. This example sets no limit on moves. A limit can be added to the model, so that re-slotting fits into one night shift.

Which data is needed?

Article master data (size, weight), the slot list and order history.

The first step

Where does your planning lose time, capacity or money?

In a free first call we work out which next step is really worth it.