Harvest planning: two combines, grain carts and a rain forecast

In which order do the combines harvest the fields today, and which cart takes each bunker load?

AgricultureAgricultural contractorsCooperatives

Drag to rotate, scroll or pinch to zoom. The schedule below plays the plan; hover a bar for details. Illustrative day plan from an optimizing heuristic; the Timefold model is built in a project.

The planning question

An arable farm in the Rhine plain: two combines can start at 10:00 when the dew is off, rain is forecast from 16:00, and grain carts shuttle the bunker loads to the farmyard silo. Rained-on crops lose value — wheat more than barley.

How we plan it

The value loss per crop drives the sequence: fields that lose the most when wet come first, as long as the carts keep up.

What the plan shows

KPIOptimized planComparison: field-number order
crop value65,300 € +2,30063,000 €
harvested before rain27 ha +5.421.6 ha
combines on the road21 min −223 min
combines waiting for carts0 min0 min

Decisions

  • field → combine and sequence
  • grain cart per bunker load

Constraints

  • harvest from 10:00 (dew), rain from 16:00
  • combine output, bunker size, road speed
  • carts tip at the silo

Objective

most crop value in before the rain, little road time, no waiting combines

Questions

Is this a Timefold model?

The demo plan is computed by an optimizing heuristic in the same format; in projects we build it with Timefold.

Does it work for contractors with many farms?

Yes — that is where planning pays off most: many machines, many fields, travel between farms.

More use cases

All use cases

Your planning problem looks different?

Every operation has its own rules. Tell us about yours — we assess feasibility and expected impact in a free initial call.

Book a free call Write to us